Seguimiento De Auditoría Cqi 12 Y Elaboración De Documentación De Planta Pintura 2
Autores del Libro:
Resumen del Libro:
Reporte de Práctica del año 2017 en eltema Ingeniería – General, Nota: ninguna, Universidad Politécnica de Aguascalientes, Idioma: Español, Resumen: This article talks about the documentation required by CQI-12, the main documents that must be in a new plant are: AMEF, control plan, flow chart and procedures for plant management. This standard also evaluates the physical aspects of the plant, such as: signaling, identification of valves, processes, etc. The purpose of this document is to show people who do not know this type of rules, the activities that are performed to meet customer requirements through parameters that have already been reviewed and checked by paint experts who share this information to ensure the Quality of the part coating.
Formatos Disponibles: PDF / EPUB
Opciones de descarga:
Si deseas obtener una copia del libro puedes usar alguna de las siguientes opciones de descarga: